SSE is a subcontractor for Skanska Sweden AB for the construction of new ferryport , FL10 .
Our mission:
Bottom of Form crest beam approximately 400 lpm , dredging and grading for erosion control , placement and positioning of approximately
110st link plates A 11 tons, the casting of approximately 4000m2 erosion control , construction of 11st bottom boxes for fender foundation.
Resources
2-3st Dive Team
Sjögrip incl. Tugboat , barges and excavator.
Sound and mobile crane Stabiliser