Status
Completed
When
Feb – Maj 2011
Where
Pålnäsviken – Älgö
12 kilometres of LPS and water pipeline is to be laid between Pålnäsviken and Älgö at Saltsjöbaden in Sweden. The excavated material at the abutment is polluted which means thatknowledge of how to handle hazardous material will come in handy. Apart from this the challengelies in weighting and laying the pipeline from the ice. The project is expected to be completed in May 2011.