2011-03-18 New water mains to the island of Ven.
Pipe laying and new distribution chamber at the harbour of Rustningshamn.
Dredging and excavation is performed by our contracting vessel Filip with a excavator on deck.
2011-03-18 New water mains to the island of Ven.
Pipe laying and new distribution chamber at the harbour of Rustningshamn.
Dredging and excavation is performed by our contracting vessel Filip with a excavator on deck.