Skip to main content
Category

Sventab

New Battery houses for ferry

By FMS, Nyheter, Projekt, SSE, Sventab

Sound Supplier loaded new battery houses in Helsingborg for the ferry Tycho Brahe.

The transport went to the shipyard in Landskrona. Two successful trips were made.

 

Status
Just finished

When
2021 oktober

Where
Sweden, Landskrona and Helsingborg

Resources:
Sound Supplier with captain and crew

 

SALVAGE OF THE HARBOUR TOWBOAT STORM PRINCESS

By FMS, Nyheter, Projekt, SSE, Sventab

SALVAGE OF THE HARBOUR TOWBOAT STORM PRINCESS

SSE/FMS Multicat Ship Sound Horizon salvages sunken ship at Göteborgs Maritiman.
Our dive team dives into the cold icy water and the subcontractor lifts with a mobile crane together with Sound Horizon’s own large crane.

Sound Horizon datasheet

Status
Just finished

When
2021 Feb

Where
Maritiman Gothenburg, Sweden

Resources:
Mulicat Sound Horizon
SSE/FMS Diveteam
Subsupplier Havator with mobile crane

 

Reunion Island

By FMS, Nyheter, Projekt, SSE, Sventab

Nouvelle Route du Littoral

SSE Multicat vessel Sound Supplier is assisting with the construction of the new “Nouvelle Route du Littoral” in Reunion Island.

Sound Supplier is now in its 5th year on the project. Our Commander Aaron serves here 1 month at a time alternately with his work with us in Malmö.

The project is published here:
Pictures Re Union Road Project

Status:
In Progress

When:
2016 – 2021

Where:

Reunion Island

Resources:
Sound Supplier with Swedish and International crew

 

THE TUNNEL ACROSS THE FEHMARNBELT

By FMS, Nyheter, Projekt, SSE, Sventab

THE TUNNEL ACROSS THE FEHMARNBELT

This interesting and challenging project has now started and we are happy to be a  part of it and post our first news.

Femern A/S is the client for the Fehmarnbelt tunnel, which is being undertaken by the two main contractors, Fehmarn Belt Contractors (FBC) and Femern Link Contractors (FLC). T

We have so far performed  works for FBC such as: anchor handling and IWS (In Water Survey). The client is satisfied and we continue!

The project is published here:
THE TUNNEL ACROSS THE FEHMARNBELT

Status
On going

When
2020 —

Where
Rödby – Puttgarden

Resources:
LĂ€nk till Marine Service Partners – Joint Venture

New mobile Divestation at SVENTAB

By Projekt, Sventab

Status
Completed

When
2016 December

Where

Stockholm – MĂ€lardalen

SVENTAB now a mobile divestation in this divebus.

We will quickly come to customers who need assistance with diving assignment.

Phone +46 (0) 8 81 31 00

WELCOME!

Resources
– Divebus with Dive Team

Replacement of water main with quay work etc. in Norrström, Stockholm

By Projekt, Sventab

Status
In Progress

When
2015

Where
Norrström, outside the Stockholm Parliament building

SVENTAB has excavated an old water main for STOCKHOLM VATTEN and performed quay work etc.. A new 140 meters steel line, diameter 1000 mm, has been welded together in Norsborg, towed into place, assembled and excavated. SKANSKA was a subcontractor working with extensive quay work.
This is an excellent execution of collaboration between contractors.

Sealing groovegroup Frölunda, Stockholm

By Projekt, Sventab

Status
Completed

When 
Summer 2014

Where 
Frölunda

SVENTAB perform on behalf of JM a bulldozer and dense casting groovegroup Frösunda, Stockholm.

The workforce consisted of a Dive Team who rinsed steel sheet piles, leveled bottom ink UV casting.

New crest beam, Liljeholmskajen

By Projekt, Sventab

Status 
In Progress

When 
2015

Where 
Stockholm, Liljeholmskajen

SVENTAB perform on behalf of JM extensive renovation and topping of the existing quay during Lilje Holm bridge in Stockholm.

The workforce consisted of one to two Dive Team that worked from the pontoons equipped among other things with divingcontainers and cranes. The picture shows the mold for the latest kajsektionen that will be completed in spring 2015th

KVV8, VĂ€rtan, Stockholm

By Projekt, Sventab

Status
Completed

When 
Sommaren 2014

Where 
Stockholm

SVENTAB perform on behalf of JM a bulldozer, leveling the ground, reinforcement and dense casting of several contiguous groove pits KVV8, Stockholm.

The workforce consisted of several Dive Team who worked in shifts / 7 days a week. 0500-2200 during the summer 2014.

We have Toyoexcavated, rinsed steel sheet pile, leveled the ground, armored ink UV casting.

Salvage of the pontoon Karolina. Stockholm

By Projekt, Sventab

Status 
Completed

When 
2015

Where
Stockholmshamnar Freeport pool

SVENTAB perform along Marine & Accident AB a salvage mission in Stockholmshamnars Freeport pool.

The workforce in the water consisted of one to two Dive Team who have sealed all the hull / deck penetrations mostly from the inside. Then were pressurized hull with air rescue method.

Project City-Söder. Stockholm 2012

By Projekt, Sventab

Status 
Completed

When 
2012

Where 
City-Söder-Stockholm

SVENTAB perform the task for Fortum and Stockholm Water installation of new heating and water of RiddarfjÀrden. District heating line 2 x 1500m. StÄl Dim 800mm. Water supply 1500m. Steel Dim 900mm.